Brief Introduction
MRac Roof Matrix III (RM III) is a galvanized steel flat roof solar mounting system that will be applicable for various flat roofs by concrete bases. The utilization of galvanization of galvanized steel material offers an economical solution that also keeps high structural strength.
Technical Parameters
Installation Site | Rooftop |
Foundation | Concrete bases |
Installation Angle | 5-60° |
Wind Load | 80m/s |
Snow Load | 1.6KN/m2 |
PV Modules | Framed,unframed |
Module Orientation | Portait and Landscape |
Standards | AS/NZS 1170 |
DIN 1055 | |
JIS C 8955:2011 | |
International Building Code IBC 2009 | |
California Building Code CBC 2010 | |
Profile Material | Q235B(Hot-Dip Galvanized) |
Fasten Parts | Stell(Darot) |
Small Components | Al6005-T5(Anodized) |
Color | Silvery or according to customer requirements |
Warranty | 10 years |
Advantages
Easy & quicker Installation:The triangle support design is simple but strong, which also makes the installation quicker.
No penetration:RM III will not penetrate the flat roof, which will protect the flat roof and make the installation easier.
Cost effective:The galvanized steel material makes RM III cost-effective.
Product Structure Diagram
Components List
![]() | ![]() | ![]() | ![]() |
Diamond End Clamp Kit | Diamond Inter Clamp Kit | Beam | Beam Connector |
![]() | ![]() | ![]() | |
Inclined Support | Triangle Jointer | Back Support |
Installation Guide
Make concrete bases with embedded bolts according to the solution drawings.
Fasten Triangle Jointers to the embedded bolts on concrete bases.
Connect Back Support to Side Beams.
Connect the assembled Back Support and Side Beams to Triangle Jointers.
Install Beams.
Install modules onto Beams with Diamond End Clamp Kits and Diamond U20 Inter Clamp Kits
The Installation is complete.
Reference Projects
Workshop
Carbon steel factory owns 15 steel rolling production lines, and 4 solar stent aluminum production lines.