NSEW Energy Pty Ltd


HomeProductsMRac Ground SolutionMRac Ground Terrace V

MRac Ground Terrace V


Brief Introduction

MRac Ground Terrace V (GTV), is specially developed for middle-to-large ground PV projects developed based on GT4. Due to its high structural strength and stability, GT V can freely adapt to areas with heavy snow and wind load. The GTV can also slightly adjust on site on anchor plates to avoid the error when driving the piles or embeding the bolts. The adjust range are: 0~20m horizontally and vertically. The GT V has no front support which is suitable for lower ground clearance and will save the cost and improve installationeffiency. The pre-assemble structural designs save more time and labor cost as well.

Technical Parameter

Installation Site:Ground
FoundationConcrete bases, Ground screws
Installation Angle5-60°
Wind Load80m/s
Snow Load1.6KN/m2
PV ModulesFramed, unframed
Module OrientationPortrait and landscape
StandardsAS/NZS 1170

DIN 1055

JIS C 8955:2011

International   Building Code IBC 2009

California   Building Code CBC 2010
Profile MaterialsAl6005-T5(Anodized)
Fasten PartsSUS304
Small ComponentsAl6005-T5(Anodized)
ColorSilvery or according to customer requirements
Warranty10 years


  1. GT V is fully pre-assmbled due to simplified structure, which will further reduce installation time.

  2. The adjustable anchor plates help to adjust the position of supports , especially when installed on concrete columns or ground screws;

  3. The square tubes are conductive to improve the stability.

  4. The beams can be well installed without drilling or cutting.

  5. If combiner boxes, inverters or back side supports are needed to be fastened to GT V, they will be installed directly on supports by T bolts without drilling on site;

Product Structure Diagram


Components List

Wide End Clamp KitU27 Inter Clamp KitC Clamp KitBeam
Beam Splice Kit

Pre-assembled GT5


T Anchor Plate

T Corrugated Anchor


Installation Guide

  1. Fasten Corrugated T Anchor Plates and T Anchor Plates onto embedded bolts on concrete bases;

  2. Fasten the T Jointer on the front of GT5 Pre-Assembled Supports to the T Anchor Plates; and fasten the Back Supports and the Inclined Support to the Corrugated T Anchor Plate;

  3. Repeat the above steps;

  4. Install Beams;

  5. Install Back Side Support;

  6. Installation of Solar Panels;

  7. The installation is complete.

Reference Projects



Carbon steel factory owns 15 steel rolling production lines, and 4 solar stent aluminum production lines.


Installation Guide

MRac Ground Terrace V Installation Guide.pdf


Recommended Products

Recommended Projects

Recommended News & Events