product presentation
MRac Ground Terrace Ⅵ(GT VI)is a ground solar PV mounting system developed from GT IV for middle-large solar PV projects. GT VI reduces cost while guarantee the structural strength, It also apply to installation area of higher requirement which higher wind and snow resistance.GT VI will realize minor adjustment of all sides by the Adjustable Base. The professional and optimized design also contributes to reducing the time cost and installation.
Technical Parameter
Installation Site | Open terrain – ground mount |
Foundation | Concrete Base or Ground Screw |
Installation Angle | 5-60° |
Wind Load | 60m/s |
Snow Load | 1.6KN/m2 |
PV Modules | Framed, unframed |
Module Orientation | Portrait or landscape |
Standards | AS/NZS 1170 |
DIN 1055 | |
JIS C 8955:2011 | |
International Building Code IBC 2009 | |
California Building Code CBC 2010 | |
Profile Materials | Al6005-T5(Anodized) |
Fasten Parts | SUS304 |
Small Components | Al6005-T5(Anodized) |
Color | Silvery or according to customer requirements |
Warranty | 10 years |
Advantages
Optimization of the design,structural firmer, reduce the cost;
The adjustable anchor plates help to adjust the position of supports, especially when installed on concrete columns or ground screws;
The square tubes are conducive to improving the stability.
If combiner boxes, inverters or back side supports are needed to be fastened to GT VI, They could be installed directly on supports by T bolts without drilling on site.
Product Pictures
Components List
![]() | ![]() | ![]() | ![]() |
Wide End Clamp Kit | U27 Inter Clamp Kit | C Clamp Kit | Rail 60 |
![]() | ![]() | ![]() | ![]() |
Rail 105 | Rail 105 Splice | Tube* Side Support (55*55Square) | Angle aluminum |
![]() | ![]() | ![]() | |
Front Support Kit | Ground Screw | Back Support Kit |
Installation Instruction
Pile Ground Screws by pile drivers at certain positions and depth;
Place the Front Support Kit and Back Support Kit on the Ground Screws Flange and then adjust as indicated in solution drawings. Connect the Supports Kit to the Ground Screws by bolt;
Connect Tube*Side Support(55*55Square) to Front Support and Back Support;
Repeate the above steps;
Install Rail 105 and then install Rail 60;
Install Solar Panels;
Complete.
Reference Projects
Workshop
Carbon steel factory owns 15 steel rolling production lines, and 4 solar stent aluminum production lines.
Installation Guide